 Section Title 
 G - 1  1. Protective Slab for Pipe
 G - 2  2. Thrust Blocking Detail
 G - 3  3. Additional Thrust Block Requirements
 G - 4  4. Mechanical Joint Anchoring Requirements
 G - 5  5. Pressure Pipe Conflict Detail
 G - 6   6. Valve Setting Detail (Gate Valve)
 G - 7  7. Valve Setting Detail ( Butterfly/ Plug Valve)
 G - 8  8. Casing Installation Detail
 G - 9  9. Trace Wire Detail
 G - 10  10. Typical Trench Detail
 G - 11  11. Concrete Pavement Replacement Detail
 G - 12   12. Flexible Pavement Replacement Detail
 G - 13  13. Utility Road Cut Pavement Restoration
 G - 14

 14. Typical Trench Detail

 G - 15  15. Pile Cap Support Detail ( Dual Pipe)
 G - 16  16. Pile Cap Support Detail ( Dual Pipe)
 G - 17  17. Concrete Pile Detail
 G - 18  18. Concrete Pile Notes
 G - 19  19. Fan Guard Detail
 G - 20  20. Underground Air Release Valve and Vault (Automatic)
 G - 21  21. Underground Air Release Valve and Valve Box (Manual)
 G - 22  22. Fence Detail
 G - 23  23. Sidewalk Details
   
 Water  
   
 Section Title 
 W - 1  24. Service Connection Detail 5/8" or 1" Meter 
 W - 2  25. 2" Meter Detail
 W - 3  26. Typical Above Ground Meter 3" or Larger 
 W - 4  27. Water Service Connections Plan and Profile
 W - 5  28. Typical Connection for Multiple Services (Three or more)
 W - 6  29. Fire Hydrant Installation Detail
 W - 7  30. Flushing Hydrant / Blowoff
 W - 8  31. Temporary Sample Point Detail
 W - 9  32. Double Check or Reduced Pressure Backflow Preventer 'Single' Service - 3/4 2"
 W - 10  33. Double Check or Reduced Pressure Backflow Preventer 'Dual' 2" Service
 W - 11  34. Backflow Preventer Single Service 4", 6", & 8"
 W - 12  35. Fire Service Double Detector Check Valve
 W - 13  36. Pressure Type Vacuum Breaker (P.V.B.)
 W - 14  37. Temporary Jumper Detail & Schedule
 W - 15  38. Double Valve Detail & Filling and Jumper Connection for Small Diameter Piping
   
 Wasterwater  
 Section Title 
 WW - 1  39. Sewer Service Cleanout (Possible Traffic Area)
 WW - 2  40. Terminal Cleanout Detail
 WW - 3  41. Typical Sewer Service Connection
 WW - 4  42. Sanitary Sewer Lateral Detail
 WW - 5  43. Wastewater Pipe Saddle
 WW - 6  44. Sanitary Sewer Manhole Frame and Cover
 WW - 7  45. Wastewater Rain Guard Detail
 WW - 8  46. Invert Flow Channel Detail
 WW - 9  47. Standard Manhole
 WW - 10  48. Shallow Manhole
 WW - 11  49. Flat Top Precast Manhole
 WW - 12  50. Doghouse Manhole Detail
 WW - 13  51. Drop Manhole (Outside Connection)
 WW - 14  52. Service Drop into Manhole
 WW - 15  53. Conflict Manhole Detail
 WW - 16  54. Force Main Entering Shallow Manhole
 WW - 17  55. Force Main Entering Deep Manhole
 WW - 18  56. Typical Lift Station Plan
 WW - 19  57. Typical Lift Station Top Plan
 WW - 20  58. Typical Lift Station Section
 WW - 21  59. Standard Aluminum Cover
 WW - 22  60. Typical Lift Station Layout Detail
 WW - 23  61. Water Service Detail at Lift Station
 WW - 24  62. Typical Lift Station Data
 WW - 25  63. Lift Station Tremie Pour Detail
 WW - 26  64. Typical Pump Station Control Panel
 WW - 27  65. Control Panel Detail
 WW - 28  66. Control Panel Deadfront Layout
 WW - 29  67. Control Panel Wiring Diagram 230 Volt, 3 Phase
 WW - 30  68. Control Panel Wiring Diagram / Bill of Materials
 WW - 31  69. Double-Compartment Grease Trap and Oil Separator