Airport Projects

Project Title Description Start Date End Date
Airport Master Plan Update To Be Announced. 6/10/2008 9/30/2009
Design & Construct Parallel Runway 9L/27R Phase 1 of the construction is currently being done.  Phase 2 construction to begin Fall 2008 with an estimated total project completion date of June 1, 2009. 12/22/2006 6/1/2009
Design/Install Access Control System Ph. 2 This project is a continuation of an earlier project and provides improvements to the existing security access control system at the Airport.  Project include card reader/punch code access systems installations, automatic gate installation, existing automatic gate upgrades, security system software/hardware upgrades. 5/28/2008 4/23/2009
Rehabilitate Runway 9R/27L (Preliminary)
This project consists of data collection and preliminary design work for rehabiliating Runway 9R/27L.
7/25/2007 12/31/2009
Security Fencing Project This project involves security fence installation at the airport. 8/1/2008 8/1/2009
Storm Water Pollution Prevention Plan (SWPPP) Inspections
This inspection is required under the National Pollution Discharge Elimination System (NPDES) permit, which is implemented by the State, and covers the industrial uses at the Airport.
10/31/2007 10/31/2008
Taxiway "A" Drainage and Repair

The drainage pipe underneath Taxiway "A", between Taxiway "B" and Runway 14 is being repaired, along with the depression on the taxiway

6/30/2008 7/30/2008
Upgrade Electrical Vault This project involves upgrades to the existing airfield electrical vault. 2/8/2008 9/30/2008