Airport Projects
| Project Title | Description | Start Date | End Date |
| Airport Master Plan Update | To Be Announced. | 6/10/2008 | 9/30/2009 |
| Design & Construct Parallel Runway 9L/27R | Phase 1 of the construction is currently being done. Phase 2 construction to begin Fall 2008 with an estimated total project completion date of June 1, 2009. | 12/22/2006 | 6/1/2009 |
| Design/Install Access Control System Ph. 2 | This project is a continuation of an earlier project and provides improvements to the existing security access control system at the Airport. Project include card reader/punch code access systems installations, automatic gate installation, existing automatic gate upgrades, security system software/hardware upgrades. | 5/28/2008 | 4/23/2009 |
| Rehabilitate Runway 9R/27L (Preliminary) |
This project consists of data collection and preliminary design work for rehabiliating Runway 9R/27L. |
7/25/2007 | 12/31/2009 |
| Security Fencing Project | This project involves security fence installation at the airport. | 8/1/2008 | 8/1/2009 |
| Storm Water Pollution Prevention Plan (SWPPP) Inspections |
This inspection is required under the National Pollution Discharge Elimination System (NPDES) permit, which is implemented by the State, and covers the industrial uses at the Airport. |
10/31/2007 | 10/31/2008 |
| Taxiway "A" Drainage and Repair |
The drainage pipe underneath Taxiway "A", between Taxiway "B" and Runway 14 is being repaired, along with the depression on the taxiway |
6/30/2008 | 7/30/2008 |
| Upgrade Electrical Vault | This project involves upgrades to the existing airfield electrical vault. | 2/8/2008 | 9/30/2008 |